LEAD THE WAY ON SAFETY TODAY

At GPS MACS health, safety, environmental impact and the wellbeing of our staff and workforce is the top priority. We all have a responsibility to lead the way on safety today, and always.

All persons on site are responsible for informing the GPSMACS Management Team of any notable accidents, with the management team in turn reporting the notifiable accident/incident to the Enforcing Authorities.

Accidents that are non-notifiable under RIDDOR will be entered into the site accident book immediately, first aid administered by the designated first aider and hospital treatment sort if necessary.

All injuries/accidents and near misses must be reported in line with the GPS MACS accident reporting procedure. All persons must be briefed on this procedure before starting works.

YOU WILL ALWAYS HAVE THE FULL SUPPORT FROM GPS MACS TO STOP ANY WORKS YOU BELIEVE IS UNSAFE.

PPE

TRAINING

RAMS / PERMITS / BRIEFING

The following is the minimum PPE expected on GPS MACS Construction Sites. Do not start work until you have been issued with all of the items. If anything is defective, report immediately to the Site Supervisor so they can discard and re-issue a new item:

  • Safety Helmet
  • Steel Toe Footwear
  • High Visibility Orange Waistcoat (With GPSMACS Name Only)
  • High Visibility Orange Coat (With GPSMACS Name Only)
  • High Visibility Orange Trousers

Task / Location specific:

  • Gloves
  •  Safety Glasses
  •  Personal Floatation Device

All persons must have completed the following prior to entering site:

  • CSCS (relevant to role)
  • SMSTS for Site Supervisors
  • First Aid for Site Supervisors

Task / Location Specific:

  • CPCS for plant operators
  • Authorised Persons for Issuing Permits must have the necessary
  • specific training as identified on the permit
  • Appointed Person for Lifting Operations Blue Card for anyone approving Lift Plans
  • STCW95 Personal Survival Techniques

The following is the minimum you must have been briefed on and signed onto before starting works:

  • Site induction
  • Start of Shift Briefing
  • Risk Assessment and Method Statement specific to your works
  • Lift Plan
  • Barge / Vessel induction
  • Permits specific to your task i.e. confined space, permit to break ground, working at height
  • Permit to Load for any temporary works
  • GPS MACS Accident and Incident reporting procedure