King George V Lock, Royal Docks - Sluice Plate Installation

Royal Docks Management Authority

Dates:

Nov 2021
Coming Soon

Related News

Coming Soon

Overview

Marine and Civil Diving Services Ltd have been contracted by Royal Dock Management Authority Ltd (RoDMA) to design, fabricate and install 4 no. steel plates seal plates over the sluice gate intakes within the KGV lock, allowing inspection works to take place inside the chamber.

Other Projects

Fambridge Yacht Haven Pile Replacement
Yacht Havens Group
Project Type: Construction

Project Duration: April 2023 – May 2023
READ MORE
Levens Viaduct
Network Rail
Project Type: Maintenance and Repair

Project Duration: Jul 2024
READ MORE
Nearshore / Inland Warerways

Within Royal Docks

Subsea

Working at depths of 14m

Health and Safety

No accidents or incidents

Royal Docks Management Authority

Project Value:

Dates:

Nov 2021
PREVIOUS
Bishopsford Bridge Cofferdam Removal
NEXT
Kingsferry Bridge Film Set

Overview

Marine and Civil Diving Services Ltd have been contracted by Royal Dock Management Authority Ltd (RoDMA) to design, fabricate and install 4 no. steel plates seal plates over the sluice gate intakes within the KGV lock, allowing inspection works to take place inside the chamber.

No results found.
Nearshore / Inland Warerways

Within Royal Docks

Subsea

Working at depths of 14m

Health and Safety

No accidents or incidents

Menu