Spingfield Mill Damaged Culvert

Marron Construction

Dates:

March 2020

Related News

Coming Soon

Overview

Marine and Civil Diving Services Ltd were contracted by Marron Civil Engineering  Ltd to provide diving services. Whilst carrying out excavation works for installation of a drainage pipe run, the trench began to fill with water. It was assumed that the water source is the adjacent lake and that the excavation works have caused damage to a buried culvert.

The Dive Team repaired the damaged culvert and drained the site successfully for works to continue.

Other Projects

Fambridge Yacht Haven Pile Replacement
Yacht Havens Group
Project Type: Construction

Project Duration: April 2023 – May 2023
READ MORE
Oikos Fuel Transfer Jetty 2 Repairs
Oikos Storage Ltd
Project Type: Maintenance and Repair

Project Duration: August 2023 – September 2023
READ MORE
Nearshore / Inland Warerways

Lake

Subsea

Health and Safety

No accidents and incidents

Marron Construction

Project Value:

Dates:

March 2020
PREVIOUS
Southend UXO Survey and Removal
NEXT
Wapping Police Pier Cathodic Protection Installation

Overview

Marine and Civil Diving Services Ltd were contracted by Marron Civil Engineering  Ltd to provide diving services. Whilst carrying out excavation works for installation of a drainage pipe run, the trench began to fill with water. It was assumed that the water source is the adjacent lake and that the excavation works have caused damage to a buried culvert.

The Dive Team repaired the damaged culvert and drained the site successfully for works to continue.

Nearshore / Inland Warerways

Lake

Subsea

Health and Safety

No accidents and incidents